/
Capture committee voting results
Capture committee voting results
JIRA reference: FT-501
High Level Requirements
Who: DPC and TPRC chairs
What:
- Chancellor's office has to go through each assessment one at a time
- helps Bev know how to review it
- there's a review that happens before the Provost reviews
When:
- at the time the DPC/TPRC chairs fill out the recommendation page
- Only show the "voting" section if the application is at the DPC / DPC redux or TPRC / TPRC redux
Where:
- On the recommendations page
- add another row on the Recommendations tab for the DPC / TPRC to add in the positive and negative votes
- On the reviews page
- add a column on the Reviews tab showing the votes
Validations:
- if DPC hits strengths and weaknesses, they don't have to vote
- if they hit yes or no, the positive and negative votes are still optional; it's affecting the file upload input field
Questions/Comments
- don't capture abstentions
- Manoa doesn't allow it
- WO does but don't capture abstentions
- should the system throw an error if the votes don't match with the recommendation, eg DPC is positive but the positives votes= 2 and the negative votes = 5
, multiple selections available,