Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 3 Next »

July 2018

7/6/2018 - All code changes pertaining to the components Main Menu, Google Team Drive, Dossier, Eligibility, Audit, Application - General, Design, Coordinators and Exclusion Form must be completed and deployed to the TEST environment

  • Cameron to get the names of all 2018 applicants and their campus designations

Week of 7/9/2018 - testing by ITS and bug fixes applied to the test environment

  • Create application in TEST to make sure of the following
    • Application successfully linked to Team Drive
    • Eligibility data pre-filled with the data from PS
    • Campus specific sections successfully created on the Dossier
  • Dossier testing
    • upload file
    • create google file
    • link to google file

7/10/2018

  • create simp ticket for production deployment of the new code base
  • create accounts in TEST for Frank, Ariana and Adam
  • create 30 more test/prod team drives

7/16/2018 - deploy new code base to production and apply schema changes

7/16/2018 - meet with Sandra to review exclusion changes and to prep for training on 7/18 and 7/19

7/16/2018 - create the 2018 applications

  • includes Frank and Ariana (and Adam?) from the Dept of Learning Design and Technology at Manoa

7/18/2018 - CC training

7/19/2018 - CC training

August 2018

Recommendation Page changes

Workflow changes (adding/removing permissions - team drive sends no information about the user)

  • Review email templates

Audit Log additions

  • No labels